Glossary

Critical path

The timing path with the least slack. It limits the maximum clock frequency of the design.

Learn it in depthStatic timing analysis and timing closure for FPGAsHow static timing analysis checks setup and hold, how to write SDC and XDC timing constraints, read WNS, TNS and WHS in a timing report, and fix failing paths.

Related terms

← All glossary terms